HOME
 
 

PHASE 2 OF THE WATERWAY

Provisional Phase 2 Route

PHASE 2 ROUTE (see dotted line)

Phase 2 of the waterway will complete the enlargement of the existing channel to navigable standard through the north of Maidenhead, linking to the Thames via Widbrook/White Brook near Cliveden Reach.

The enlarged channel would have a potential role as part of the Environment Agency flood relief plans, when operated in conjunction with the main Thames and Jubilee rivers.

 
Print page

MWRG Disclaimer

Disclaimer

Copyright ©2008 Maidenhead Waterways Restoration Group (MWRG) This website was produced by MWRG, a company limited by guarantee and Registered Charity No. 1119150. Views and content from external links, accessed directly or indirectly via this website, are not the responsibility of MWRG.

IWA Corporate Member

Last modified: 20. 03. 08